PWR ON – E-powered work machines
1 January 2023 - 31 December 2023
PWR ON project will integrate a battery/fuel cell simulator into NUVE-LAB environment. Simulator will be taken in use by 11/2023.
With the battery simulator, electrical power transmissions and electrical working machines can be tested without actual traction batteries, which are the most valuable part of the electrical power transmissions. The battery simulator enables researching and testing of the different electrical power transmission solutions without investing to expensive traction batteries and without a risk of extremely hard extinguished battery fire.
PWR ON will also improve NUVE-LAB abilities to monitor the Device Under Test comprehensively.
Funding
Funded by EAKR (2014)